On Going Project

Lot 281 Rehabilitation / Construction of Kaneville Main Access Road Region 4

Lot 19 Rehabilitation and upgrade of Lamaha Street (Middleton to Sheriff Street) Georgetown Region 4

Lot 19 Rehabilitation and upgrade of Lamaha Street (Middleton to Sheriff Street) Georgetown Region 4

Project Status

Existing Condition:
Dilapidated Asphaltic Concrete Word Required: Full construction of existing roadway through excavation to a depth of 0.80m, placement & compaction of 300m white sand, 300m WS/SC, 150mm Crushed Aggregate & 50mm Asphaltic Concrete. All works include the construction of a reinforce concrete retaining wall and a RC Drain on either side of the pavement alongside a rigid paved shoulder. Works also include the construction of 1 No. Reinforced Concrete culverts.

Finished Surface: 50mm Asphaltic Concrete Estimated Length: Sections – 390m
Estimated Width: 6.10m

about us

SAWA Investment originated from the Asian county of Berbice by founder Ms. Samantha Reid.

Our two office locations:
Berbice Office:
Lot 59 Stanleytown New Amsterdam
Berbice
Tel: 592-333-3525

Georgetown Office:
251 Thomas Street
South Commingburg
Georgetown
Tel: 592-500-6946

contact us Today

+(592)333-3525

sawainvestment.inc@gmail.com

General/Office Information Lot 59 Stanleytown,New Amsterdam Berbice

Copyright © 2023 SAWA Investment Inc. | Powered by Mileage Advertising & Marketing (info@mileageads.com)