Lot 281 Rehabilitation / Construction of Kaneville Main Access Road Region 4
Lot 19 Rehabilitation and upgrade of Lamaha Street (Middleton to Sheriff Street) Georgetown Region 4
Lot 19 Rehabilitation and upgrade of Lamaha Street (Middleton to Sheriff Street) Georgetown Region 4
Project Status
Existing Condition: Dilapidated Asphaltic Concrete
Word Required: Full construction of existing roadway through excavation to a depth of 0.80m, placement & compaction of 300m white sand, 300m WS/SC, 150mm Crushed Aggregate & 50mm Asphaltic Concrete. All works include the construction of a reinforce concrete retaining wall and a RC Drain on either side of the pavement alongside a rigid paved shoulder. Works also include the construction of 1 No. Reinforced Concrete culverts.